Projects 2021-Present
Study, Analysis and Development Plan for the Intercity Motorway Project No. 82, Bang Khun Thian – Pak Tho (Ban Phaeo – Pak Tho section) (2025-2026)
CLIENT: Department of Highways (DOH), Ministry of Transport
AMP Consultants Ltd. is preparing a Study, Analysis, and Development Plan for the Department of Highways’ Intercity Motorway No. 82, Bang Khun Thian –
Pak Tho (Ban Phaeo – Pak Tho section). The plan is being undertaken in collaboration with Asian Engineering Consultants Corp., Ltd. and Dhara Consultants Co., Ltd. AMP has reviewed related studies and development plans, including economic and social research, impacts of urban development, traffic impact studies and traffic data surveys in the project’s area of influence.
The Study, Review and Analysis for the Project, and Preparation of Bidding Documents, in accordance with the Public-Private Partnership Act B.E. 2562 (2019) for the cooperation between the Government of the Kingdom of Thailand and the Government of the People’s Republic of China, for the development of a regional high-speed rail system (Bangkok-Nong Khai section) (2025)
CLIENT: State Railway of Thailand (SRT), Ministry of Transport
AMP Consultants Ltd. carried out an extensive study, review, and analysis of the project’s feasibility and prepared bidding documents in line with the Public-Private Partnership Act B.E. 2562 (2019). This is a collaborative initiative between the Governments of the Kingdom of Thailand and the People’s Republic of China, which focuses on the development of a high-speed rail system to improve regional connectivity.
Independent Technical Advisor (3rd Term) (2024-2030)
CLIENT: BBL Asset Management Co., Ltd. (BBLAM): Bangkok Mass Transit System Growth Infrastructure Fund (BTSGIF)
AMP Consultants Ltd. was commissioned by BBL Asset Management Co., Ltd. for a second 5-year term, as an independent technical advisor for the Bangkok Mass Transit System Growth Infrastructure Fund (BTSGIF). The technical advisor role is required by the rules and regulations of the Securities and Exchange Commission of Thailand to assist the fund management board in the planning and technical aspects of BTS system operation and maintenance.
The Preliminary Feasibility Study on the Development of the Highway Network Connecting the New Double-Track Railway Station for Ban Phai – Nakhon Phanom (2023-2024)
CLIENT: Department of Highways, Ministry of Transport
AMP Consultants Ltd., in collaboration with Asian Engineering Consultants Co., Ltd. and Dhara Consultants Co., Ltd. have provided consultancy services for the Department of Highways, with objectives to develop the Highway Network Connecting the New Double-Track Railway Station for Ban Phai – Nakhon Phanom.
The Consultancy Service for Preparation of the Business Plan, Scope of Services and Draft Contract for Private Provision of an Electric Bus Service in Samut Prakan Province (2023-2024)
CLIENT: Samut Prakan Provincial Administrative Organisation
AMP Consultants Ltd. was commissioned by Samut Prakan Provincial Administrative Organisation as the technical advisor for the development of a feeder system connecting to the Green Line Extension at Kheha Samut Prakan Station (Kheha Station). The objective was to link communities along the Sukhumvit Road to Klong Dan Market using electric buses, thus reducing traffic congestion and air pollution caused by personal cars.
Independent Technical Advisor (2018-2023 – 2nd Term) (2018-2023)
CLIENT: BBL Asset Management Co., Ltd. (BBLAM): Bangkok Mass Transit System Growth Infrastructure Fund (BTSGIF)
AMP Consultants Ltd. was commissioned by BBL Asset Management Co., Ltd. for a second 5-year term, as an independent technical advisor for the Bangkok Mass Transit System Growth Infrastructure Fund (BTSGIF). This repeat business by a key Client demonstrated their satisfaction of the service provided during the previous term and confidence in AMP’s continuing delivery.
The Study of a Governance Plan for the Management of a Common Ticketing System (2020-2022)
CLIENT: Office of Transport and Traffic Policy and Planning (OTP), Ministry of Transport
AMP Consultants Ltd. was commissioned by The Office of Transport and Traffic Policy and Planning (OTP) as the technical advisor for developing a Governance Plan for the Management of a Common Ticketing System. The study provides guidelines for the governance and management of common ticketing in order to ensure a high degree of efficiency and completeness, with common objectives that provide convenience and savings for passengers and encourages an increase in the number of passengers using the public transport system.
The Relationship Building with Stakeholders (2022)
CLIENT: The National Housing Authority (NHA), Ministry of Social Development and Human Security
AMP Consultants Co., Ltd. is providing consultancy services for the National Housing Authority to review their stakeholder strategic plan and ensure that it is connected, consistent and integrated with their corporate governance (CG) guidelines and annual action plan for relationship building/management with stakeholders.
A Study of the Involvement of the Private Sector in Rail Freight Operation (on Nongkhai – Laem Chabang Port route) according to the Private Investments in State Undertakings Act B.E. 2562 (2019): 2019-2022 (2019-2022)
CLIENT: State Railway of Thailand (SRT), Ministry of Transport
AMP Groups and Kasetsat University advised the State Railway of Thailand on the structuring of a Public-Private Partnership (PPP) program for rail freight operation between Nongkhai – Laem Chabang Port. Key elements of the work in this project included (i) assessment of the technical, economic and financial viability of the project; (iii) structure and analysis of an appropriate PPP scheme using financial modeling techniques including risk analysis and Value-for-Money Analysis; and (iv) draft PPP tender documents and PPP contract.
Consultancy Service for the Development Plan for Area Traffic Control System (2021)
CLIENT: Traffic and Transportation Department (TTD), Bangkok Metropolitan Administration (BMA)
AMP Consultants Ltd. was commissioned by the Traffic and Transportation Department of the Bangkok Metropolitan Administration to undertake a Study for an Area Traffic Control (ATC) in Bangkok and the surrounding area. The study entails conducting an analysis of traffic movement and management in order to optimise the efficiency of traffic junctions by coordinating the traffic control in a given area (i.e. Area Traffic Control or ATC).