Projects 2006-2010
Independent Consultant for the Implementation of the Automatic Fare Collection System for Bus Rapid Transit in Bangkok (2010)
CLIENT: The Krungthep Thanakom Co., Ltd., Bangkok Metropolitan Administration (BMA)
AMP Consultants Ltd. was commissioned by The Krungthep Thanakom Co. Ltd. to act as an independent consultant for implementation of the Automatic Fare Collection (AFC) system for the first Bus Rapid Transit (BRT) route in Bangkok. This was repeat business from a key Client following successful completion of two earlier commissions during the Advisory and Procurement phases.
Advisory Service on Implementation of the BRT Automatic Fare Collection System (2010)
CLIENT: The Krungthep Thanakom Co., Ltd., Bangkok Metropolitan Administration (BMA)
AMP Consultants Ltd. was commissioned by Krungthep Thanakom Ltd. to provide advice on the implementation and operation of the Automatic Fare Collection (AFC) system for a new Bus Rapid Transit (BRT) service.
Consultant for the Selection of Provider and Contractor of the Automatic Fare Collection System for the Bus Rapid Transit System in Bangkok (2010)
CLIENT: The Krungthep Thanakom Co., Ltd., Bangkok Metropolitan Administration (BMA)
AMP Consultants Ltd. was commissioned by The Krungthep Thanakom Co., Ltd. to act as consultant for the selection of Automatic Fare Collection (AFC) System Provider and Contractor for the Bus Rapid Transit (BRT) system. This was repeat business from a key Client following an earlier successful advisory commission.
TCL Business Plan (2010)
CLIENT: Transport Co., Ltd. (TLC), Ministry of Transport
AMP Consultants Ltd. was commissioned by TCL to structure and draft its business plan in order to prepare the firm for the implementation of intercity bus deregulation policy.
Local Road Development Master Plan (Phase 2) (2010)
CLIENT: Department of Rural Roads (DRR), Ministry of Transport
AMP Consultants Ltd. were engaged by the DRR to continue developing a Master Plan for Rural Roads (Phase 2), which is repeat business following an earlier commission undertaken by AMP in connection with Phase 1.
Development of Common Fare System for Public Transport in Bangkok Metropolitan Area (2010)
CLIENT: Office of Transport and Traffic Policy and Planning (OTP), Ministry of Transport
AMP Consultants Ltd. and our partner worked with OTP to develop a framework for implementation of a common fare system for public transit systems in Bangkok Metropolitan Area and its surrounds, including rail mass transit, bus, and boat.
The Study on Public Transport Operation Development for Intercity Passengers (2010)
CLIENT: Office of Transport and Traffic Policy and Planning (OTP), Ministry of Transport
AMP Consultants Ltd., and partners were commissioned by OTP to investigate improvement of public transport operation for intercity passengers.
Study of Fixed Route Bus Reform in Thailand (2009)
CLIENT: Department of Land Transport (DLT), Ministry of Transport
AMP Consultants Ltd. was commissioned by DLT to advise on how the operation of fixed-route buses in Thailand could be improved.
The Study on Development of High Potential Industries and Services in the Southern Region (2009)
CLIENT: Office of the National Economic and Social Development Board (NESDB), Office of the Prime Minister
AMP Consultants Ltd. was commissioned to advise the NESDB on the development of high potential, large-scale industries in the Southern Region of Thailand, including identifying any key environmental concerns to be addressed during the implementation of such industrial development.
The Study of Common Ticketing to Encourage Greater Utilisation of Travel on Transit System and Establishment of Central Clearing House (2009)
CLIENT: Office of Transport and Traffic Policy and Planning (OTP), Ministry of Transport
AMP Consultants Ltd. led a consortia who were commissioned by OTP to undertake a study of a common ticketing system for public transport and the establishment of a clearing house for Bangkok.
Local Road Development Master Plan (Phase 1) (2009)
CLIENT: Department of Rural Roads (DRR), Ministry of Transport
AMP Consultants Ltd. were commissioned by the DRR to develop a Master Plan for Rural Roads (Phase 1). The successful delivery of tasks led to repeat business for AMP in connection with Phases 2 and 3.
The Study on Strategy of Strengthening Transport Linkages Capability in order to Accommodate an Expansion of Economic, Trade and Investment Route (2009)
CLIENT: Office of Transport and Traffic Policy and Planning (OTP), Ministry of Transport
AMP Consultants Ltd. was commissioned to undertake a Study of the ability of strategic transport linkages to accommodate an expansion of trade and to identify the investment needed.
The Study of Truck Route Development and Multimodal Freight Transport Management System (2009)
CLIENT: Office of Transport and Traffic Policy and Planning (OTP), Ministry of Transport
AMP Consultants Ltd. and Chiang Mai University was commissioned to advise OTP on the Development of truck routes and a freight transport management system to support their Multimodal Transport Framework.
Transport Development Plan for Suvarnabhumi Aerotropolis (2008)
CLIENT: Office of Transport and Traffic Policy and Planning (OTP), Ministry of Transport
AMP Consultants Ltd. and partner was commissioned to advise OTP on development of the transport system needed to support expansion at Suvarnabhumi Aerotropolis, which comprises Suvarnabhumi International Airport and the surrounding communities.
Framework and Case Study for Public-Private Partnership in Thailand’s Highway Program (2008)
CLIENT: Department of Highways (DOH), Ministry of Transport
AMP Consultants Ltd. and partner was appointed to advise the DOH on the development of a Project Framework and also undertake a Case Study for Public-Private Partnership (PPP) for Thailand’s Highway Program.
Urban Development Plan, Phase I (2007)
CLIENT: City Planning Department (CPD), Bangkok Metropolitan Administration (BMA)
AMP Consultants Ltd. was appointed as the transport planning consultant to analyse and advise on the development of the transportation network (i.e. road, rail and water transport), trip patterns and mode of transport in relation to the Bangkok’s Urban Development Plan.
A Tracking System for Patrol Operation of Samut Prakan Police (2007)
CLIENT: Samut Prakan Provincial Police
Amp Group were part of a consortia commissioned by the Samut Prakan Provincial Police to implement a tracking system for its patrol motorcycle and car fleet, to monitor and analyse vehicle behavior using GPS and communicate the information to the control centre using GPRS.
Planning for the Management and Operation of a Bus Rapid Transit (BRT) Project (2007)
CLIENT: The Krungthep Thanakom Co., Ltd. Bangkok Metropolitan Administration (BMA)
The BMA commissioned AMP Consultants Ltd. to support the planning for the management and operation of a BRT project, including network development, ridership forecast, ITS requirements and conceptual design.
The Study of Strengthening Cross-Border Freight Transport Capability to enhance Thailand’s Strategy to become the Indo-China Transport Hub (2007)
CLIENT: Office of Transport and Traffic Policy and Planning (OTP), Ministry of Transport
AMP Consultants Ltd. was commissioned to advise OTP on a national strategy to enhance the role of Thailand as an Indo-China Transport/Logistics Hub.
The Survey and Design of Country-wide Radio Communication System (2006)
CLIENT: Ministry of Natural Resources and Environment (MNRE)
AMP Group and partner were appointed by the MNRE to provide advice on the survey and design of a country-wide radio communication system.
Feasibility Study of Chaiyaphum Logistics Centre (2006)
CLIENT: Chaiyaphum Province
AMP Consultants Ltd. were commissioned with partners to study the feasibility of the Chaiyapum Logistics Centre, a proposed logistics hub that would serve the Mid North Eastern Region of Thailand.